26 June 2024

Work was conducted outside the approved work order and permit. Had this work been included on the permit, electrical checks on the UAT would have been included as a QA check prior to returning the unit to service. These checks would have likely identified the defect before the UAT was energised.

Read more...

26 June 2024

During the Rotokawa Upgrade Project in July 2021, a control system failure led to a sequence of events that resulted in a Steam Hammer incident. 

Read more...

24 May 2024

During preparation of a wireline tool, the well flowed over the BOP's.

Read more...

24 May 2024

The AA batteries in an employee's helmet headlamp did not conform with the hazardous area (pentane) certificate.

Read more...

6 March 2024

A brief reminder of animals being on the roads especially during dusk and dawn times.

Read more...

12 February 2024

While running 30" casing, a worker found a circlip on the rig floor. The operation was immediately stopped, and a thorough search commenced which identified the 30" elevator hinge pin was missing the circlip.

Read more...

12 February 2024

A Contractor was using a tagged grinder to buff the turbine casing half joint. When he had finished, he pulled the grinder lead towards himself. The lead was draped over a scaffold, and he received a minor electric shock.

Read more...

1 February 2024

Two technicians were removing a flow meter on the cooling tower, during the removal a technician located on the lower platform was in a kneeling position and while standing up, placed some of his weight with his hand on the railing to support himself.

Read more...

11 December 2023

Casing for geothermal well (42" diameter x 12m long x 3 tons) dropped approximately 1 meter during off loading from truck.

Read more...

30 November 2023

A contractor was drilling into a concrete wall in the power station when they made contact with an embedded lighting cable.