StayLive actively promotes the sharing of information as soon as possible after near miss or actual safety incidents to inform members about hazards arising out of their operations.
During the routine process of removing 1 of the 8 Spillway stoplog sections from Clyde spillway gate 3, stoplog section No 3 pitched up at one end and jammed in the guides as it exited the water. The sound of the crane motor load increasing alerted the dogman/operator that something was wrong, and the lift was immediately stopped. This resulted in the stoplog becoming bent and damaged at teh left bank end.