Shared Learnings

StayLive actively promotes the sharing of information as soon as possible after near miss or actual safety incidents to inform members about hazards arising out of their operations.

Water overflowed the BOP

Date of Incident: 1 May 2024
Description:

During preparation of a wireline tool, the well flowed over the BOP's. The team had to intervene and shut the annular BOP and quench the well until the well head pressure had been reduced from 165 down to 0 psi.

Original Shared Learning

MoST Content Management V3.0.8914