High voltage transmission line fault caused the feed pumps at the EGL TOPP1 plant to trip offline.
Dropped spanner whilst suspended tool bag was being lowered down the headgate of the dam.
A pre-shut scaffold was assembled between two steam pipelines (RC1 and RC2) in the steam field east of Te Mihi. The scaffold was constructed with a gap of approximately 300mm between the pipelines.