Our Goal: The Electricity Industry is the industry leader in health, safety and wellbeing practice in NZ


Latest Shared Learnings

High voltage transmission line fault caused the feed pumps at the EGL TOPP1 plant to trip offline.

Read more...

Dropped spanner whilst suspended tool bag was being lowered down the headgate of the dam.

Read more...

A pre-shut scaffold was assembled between two steam pipelines (RC1 and RC2) in the steam field east of Te Mihi. The scaffold was constructed with a gap of approximately 300mm between the pipelines.

Read more...