Latest Safety Alerts
A new screen cleaner and intake screens were being installed at the intake forebay on the canal.
From 9th June 2025, BOC are introducing an increased pressure and capacity MP15 Nitrogen Cylinder (152MP15) in the North Island which will replace the existing G15 cylinders (152G15).
During the commissioning of G2 11kV switchgear cubicle and circuit breaker, three tagged earthing leads were inadvertently left connected to the G2 11kV terminations on the Local Services Transformer.